The power switch must be in the “on” position. The display screen must be color. If the main display has a black-and-white screen, this functionality will not work.
Program to ONLY power on the Coffee Boiler
Program the coffee boiler to the same start time.
Program to power on BOTH the Coffee Boiler and Steam Boiler
Program the coffee boiler start time, and program the steam boiler to power on 15 minutes or more after the coffee boiler. Otherwise, the steam icon can be depressed to warm up a cold steam boiler.
Program to power on the Steam Boiler Only
There is no functionality to accomplish this programming.
Program Boilers to Turn Off
The coffee boiler must always be programmed on for the steam boiler to be programmed. The steam boiler can not be programmed to stay powered on after the coffee boiler is programmed off. Hence, both boilers can be programmed to power off at the same time, or the steam boiler can be programmed to power off before the coffee boiler is programmed to power off